United Utilities has concluded the process of awarding framework agreements for it's Build Only delivery runway. These frameworks form part of the design and build delivery runway within our AMP8 operating model.
Framework agreements have been awarded for construction of assets in two Lots:
Lot 1 - Non-Infrastructure
Lot 2 - Infrastructure
Lot 1 Non-Infrastructure: Water Treatment, Waste Water Treatment, Pumping Stations & Storage, Reservoirs, Bio Resources and Energy.
Work types that form part of the Lot 1 Non-Infrastructure works (non-exhaustive) include:
• Sludge treatment Bio-digesters
• Chemical Dosing Rigs
• Primary, secondary & tertiary wastewater treatment process
• Gas Holders
• MEICA Installation and commissioning
• Presses
• Combined Heat and Power
• Access Roads and Site Facilities
• Other construction works.
Lot 2 Infrastructure: Water Networks & Water Network Pipelines, Wastewater Networks & Wastewater Network Pipelines, Pumping Stations & Storage and Reservoirs.
Work types that form part of the Lot 2 Infrastructure works (non-exhaustive) include:
• Pump Installations
• Concrete in-situ tank installations
• Pre-fabricated tanks
• CSO chamber installations & pump return
• Sewer upsizing and installations
• Screen installations
• MEICA Installation and commissioning
• Access Roads and Site Facilities
• Other construction works.