Floor coating work.
VE 146 - floor coating
Floor coating work on a new clinic in 2 spatially separated components, as a 7-storey structure
Component P
- Shot peening, diamond grinding approx. 8 800 m
- cove approx. 300 m,
- 2K epoxy resin coating, dust-binding seal approx. 3 400 m
- 2K epoxy resin coating, dust-binding, oil-resistant approx. 350 m
- 2K epoxy resin coating, logistics areas / ramp approx. 3,800 m
- 2K epoxy resin coating, stairwells approx. 650 m
- 2K epoxy resin coating, dissipative approx. 100 m
- 2K epoxy resin coating Supply air, cor. LMHV and VDI 6 022 approx. 300 m
- 2K wall coating, hygienic approx. 120 m
Component D / F
- Shot peening, diamond grinding approx. 6 350 m
- cove approx. 25 m,
- 2K epoxy resin coating, dust-binding seal approx. 4,900 m
- 2K epoxy resin coating, dust-binding, oil-resistant approx. 480 m
- 2K epoxy resin coating, logistics area approx. 410 m
- 2K epoxy resin coating, stairwells approx. 700 m
- 2K epoxy resin coating, acc. LMHV and VDI 6022 approx. 30 m