Project: New building of the Edith-Stein schools Rottweil 3 full floors BRI 14 840 cbm Total construction time: July 2018 to December 2019
- terrain modeling,
- Concrete paving 20 x 20 x 8 cm approx. 1 300 m
- Turf joint stone 20 x 20 x 8 cm approx. 600 m
- angle support elements height 130 cm approx. 65 running meters,
- angle support elements height 180-230 cm approx. 18 m,
- Block steps 30 x 15 x 275 cm, 6 pcs,
- Block steps 32 x 15 x 275 cm, 60 pcs,
- Outdoor equipment house made of precast concrete elements with wooden sliding door,
- Facade channels approx. 20 m,
- drainage channels NW 100 approx. 105 running meters,
- drainage pits, sole width approx. 1.00 m - 2.50 m approx. 115 m,
- Lawn sowing approx. 3,200 m
- Hochstamm STU: 20/25 10 St.