Hydraulic works of the stream project including construction lines and sewerage systems, concrete works, pavement works.
— New open clot length: 430 m,
— number of corrugated steel openings: 4 pcs.
— Number of frame bridges: 1 pc.,
— Number of collectors: 2 pcs.
— New meteor water pipes (DN 250): 300 m.
Hydraulic works of the stream project including construction lines and sewerage systems, concrete works, pavement works.
— New open clot length: 430 m,
— number of corrugated steel openings: 4 pcs.
— Number of frame bridges: 1 pc.,
— Number of collectors: 2 pcs.
— New meteor water pipes (DN 250): 300 m.