Partial new construction of the Emmy-Noether-Straße on approx. 380 m length in the area of the Kohlenhof area in Nuremberg including canal laying, as a one-way carriageway including cycle paths and footpaths with green strips and construction of the drainage systems incl. main canal with connection to Kohlenhofstraße and Steinbühler Straße.
Fräsfläche 1380 m2
Asphaltdeckenbau 3245 m2
Cycle path asphalt 1170 m2
Paved pavement 1485 m2
Hauptkanallänge 348 m
Rechteckfertigteilschacht 1 St.
Fertigteilschächte DN 1200 2 St.
Fertigsteilschächte DN 1000 4 St.
Disposal soil/rock 13,650 t
Partial new construction of the Emmy-Noether-Straße on approx. 380 m length in the area of the Kohlenhof area in Nuremberg including canal laying, as a one-way carriageway including cycle paths and footpaths with green strips and construction of the drainage systems incl. main canal with connection to Kohlenhofstraße and Steinbühler Straße.
Fräsfläche 1380 m2
Asphaltdeckenbau 3245 m2
Cycle path asphalt 1170 m2
Paved pavement 1485 m2
Hauptkanallänge 348 m
Rechteckfertigteilschacht 1 St.
Fertigteilschächte DN 1200 2 St.
Fertigsteilschächte DN 1000 4 St.
Disposal soil/rock 13,650 t