Sanitary works as part of the extension (6-class new building) of
Pestalozzi school in 61184 Karben
General construction description:
In Groß-Karben, a new residential area is being built on the northern edge. The sharply rising
Student numbers make it necessary to expand the Pestalozzi school. After canceling a
Exagged concrete construction from 1964 is being built on the existing 4-class building from 1997
cultivated.
The result is an L-shaped building that follows on from the existing building and extends along the
Karbener Wweg. The north wing, which adjoins the two-storey 4-class building,
will also have two floors, the east wing along the Karbener Wweg has three floors with
basement. The staircase with lift system is located at the transition between the building wings. The
East wing on Karbener Weg receives an external escape route as the 2nd structural escape route
Escape stairs.
The building will be constructed in solid construction, with a rear-ventilated curtain wall with
high pressure laminate boards. The roofs are flat roofs, the east wing is green, the
Two-storey north wing graveled with a photovoltaic system.
In the two-storey north wing, classrooms, group rooms, meeting and
Teacher lounges and IT rooms.
Technical and storage rooms in the basement in the east wing, the canteen on the ground floor with
Utility kitchen, on the 1st floor rooms for the afternoon with offices and on the 2nd floor
Upstairs further classrooms with offices for funding.
The electricity and IT supply is provided via the existing buildings as well as by connection to the
Kurt-Schumacher school from across the street.
Water and heat are also supplied via the existing buildings, supplemented by
a heat pump for new buildings.
protective and rainwater (mixed system) are transferred to the existing sewage system
connected.
Trade description:
Sanitärarbeiten
hand wash basins 23 pcs
WC and urinals 12 pcs
Installation elements 35 pcs
Handicapped toilet complete 1 pc
stagnant flushing 6 pcs
Wall cupboard 1 pc
instantaneous water heater 6 pcs
softening system 1 pc
pipe 548 m
Elbow, T-piece, sleeves, transitions 836 St
Insulation-thermal insulation 548 m
PP pipe 209 m
PP pipe bend branch 172 St
Full grease separator 1 pc
Double pump lifting system 1 pc