The operation consists of 354 housing units spread over 2 buildings R + 8 of 68 dwellings each (building n ° 10 and 11, rue Marx Dormoy) and a set of R + 4 (buildings n ° 12 to 20)
Rehabilitation in an occupied environment
construction of a reception point (space receiving the public + space reserved for Scalis staff)
Closed Cover / Structural workExternal thermal insulation work, facades and railings, roofs, structural work, asbestos removal and exterior joinery
Interior rehabilitation - common and private areasComplete renovation work of the 31 entrance halls of the district (8 halls in the R+8 on Marx Dormoy Street + 23 halls in the R+4): interior cladding, mailboxes (Bal), lifts of people (Pmr), locksmithing and joinery of the halls - all excluding electricity common areas (see interface with Lot 04)
Plumbing heating ventilationInstallation of plumbing, insulation of networks, improvement and balancing of the district heating network, mechanical ventilation low pressure hygro B
Strong and weak currentsVerification, security and consuel of dwellings (in occupied areas), lighting, intercom and digital signage in common areas
Construction of the reception pointConstruction of a reception point under the current porch of No. 3, rue Adjudant-Chef Gautier.
preparation of the land with problems of buried networks then construction any trades (Tce)
premises consisting of two parts: one receiving the public (ERP), the other dedicated to local staff