Contract Value:
-
Notice Type:
Contract Notice
Published Date:
29 September 2023
Closing Date:
27 October 2023
Location(s):
DE40D Ostprignitz-Ruppin (DE Germany/DEUTSCHLAND)
Description:
Geothermal energy Neuruppin – drilling technology; Lot 10: Core Service

Stadtwerke Neuruppin GmbH has a district heating network that is currently supplied exclusively with boilers and CHPs. For decarbonization, a geothermal energy center is to be built at the Heinrich-Rau-Straße site.

The permit field to be used for this purpose has an area of approx. 13,448,600 m² and is located in the district of Ostprignitz-Ruppin. Due to numerous boreholes in the immediate vicinity of the planned drilling site, which represent an exceptionally good data situation, the Aalen sandstone aquifer at a vertical depth of approx. 1,700 m was selected as the preferred target for the geological knowledge analysis. Based on the productivity index of PI = 135 m³/h / MPa, a production of 200 m³/h of geothermal brine with a pumping temperature of approx. 70.5 °C can be realized.

Based on the consumption parameters of the entire heating network of Neuruppin's city centre, an energy balancing was carried out. As a result, up to 76,000 MWh of geothermal heat can be fed into the district heating network with the use of high-temperature heat pumps.

In lot 10, the core service including equipment for the two deep geothermal boreholes Gt Neuruppin 3 and 4 is queried. The bills of quantities include all services, materials and equipment necessary for the core work. In addition, all investigations on the nuclear material are also queried.

Download full details as .pdf
The Buyer:
Stadtwerke Neuruppin GmbH
CPV Code(s):
45251141 - Geothermal power station construction work