The contract work will be carried out as a model-based project. Includes construction of a new pedestrian and cycle path with new road lighting, rerouting of road 152, a new roundabout, rerouting of municipal roads, rerouting of private exits/access roads and existing high-voltage, low-voltage and signalling cables. In addition, parts of the existing pavement will be rebuilt, a new mains water supply will be built, the existing water and sewage system will be rebuilt, the existing steel footbridge will be rebuilt and the retaining walls will be built. One of the walls must include a permanent pipe point.
The contract work will be carried out as a model-based project. Includes construction of a new pedestrian and cycle path with new road lighting, rerouting of road 152, a new roundabout, rerouting of municipal roads, rerouting of private exits/access roads and existing high-voltage, low-voltage and signalling cables. In addition, parts of the existing pavement will be rebuilt, a new mains water supply will be built, the existing water and sewage system will be rebuilt, the existing steel footbridge will be rebuilt and the retaining walls will be built. One of the walls must include a permanent pipe sheet.