Helen Ltd is constructing a Bio Heat Plant with a fuel heat input of 220 MW. The main fuel will be wood based biomass. The procurement consists of a biomass boiler plant based on Circulating Fluidized Bed (CFB) technology, flue gas condensing plant, auxiliary equipment and boiler house.
The procurement consists of 2 parts:
1) Boiler Plant;
2) Flue Gas Condensing Plant.
This procurement consists of a district heating boiler plant with CHP reservation based on circulating fluidized bed (CFB) combustion technology with auxiliary systems including boiler house. Main fuel will be woody biomass.
This procurement consists of a flue gas condensing (FGC) Plant including a flue gas condenser, combustion air humidifier with needed auxiliary systems and equipment and condensate cleaning system to produce demineralized makeup water for boiler and makeup water for district heating network. The procurement includes also building.