The Stadthalle Chemnitz, which opened in 1974, will be supplemented by a congressional annex. This project is part of an overall measure, which also includes renovation measures and the replacement of ventilation and air conditioning systems. The congress extension subproject is called TP8 CCC. This subproject is an extension of the inventory structure with 3 additional meeting rooms. After partial demolition of the "loading zone" on the Theaterstrasse, the building volume is supplemented on this side (facade N / NW). The tender includes the metal perforated metal panels - walls in the area of this extension.
Congress Foyer:
- 10 m
- 9 lfm wall corner bracket - stainless steel.
Meeting room 2:
- 24.81 m
- 5.44 lfm wall completion angle - stainless steel.
Meeting room 4:
- 21.88 m
- 5.44 lfm wall completion angle - stainless steel.