Alloti market, of 14 lots. For information, lot 10 was the subject of a previous consultation. The estimated date for the start of work is scheduled for January 2020 (according to the schedule with 1 start of work by lot 10, from a previous consultation). The overall execution time of the site, all lots combined, is 23 months, including the preparation period and holidays. For lots 12030-12040-12070-12080-12190-12290-12320-12380-12470-12690: the contract is concluded at firm and final fixed price. For lots 12090-12140-12170 and 12400: Component A: the contract is concluded at a firm and final overall price. Component B: the contract is concluded at firm and final unit prices. The contract does not foresee, either for the contractor, or for the subcontractors, payments as an advance. Retention of guarantee: 5% of the amount of the initial contract, increased if necessary by the amount of endorsements.
Lot 12030 temporary supports - special foundations.
Lot 12320 locksmith.
Lot 12380 garage doors.
Lot 12,400 tiling screeds, flexible floors, earthenware.
Lot 12,470 elevators.
Lot 12,690 green spaces.
Lot 12040 structural work.
Lot 12070 waterproofing.
Lot 12080 PVC exterior joinery - blackout.
Lot 12090 wood interior joinery.
Lot 12140 plastering paint finishes.
Lot 12170 heating ventilation plumbing sanitary.
Lot 12190 electricity strong currents weak currents.
Lot 12,290 facades.