civil engineering works for the construction of four residential buildings;
3. BA White City ;
Emil-Büge-Straße 2 A - D, 16515 Oranienburg
Earthwork
approx. 1,989 m³ of soil loosening, loading, transporting, disposing;
produce approx. 3,046 m² of raw grade;
supply and install approx. 1,067 m³ of soil;
Construction roads
produce approx. 1,000 m² construction line;
Waste water disposal
approx. 60 m sewer DN/OD 160 PP, incl. pipe trench;
approx. 140 m sewer DN/OD 200 PP, incl. pipe trench
produce;
approx. 14 pcs inspection shafts DN 400...600 PP, depth up to 2.00 m;
Local heating supply
approx. 175 m local heating pipeline, incl. pipe trench