The measure includes ground investigation in the run-up to two replacement buildings in the course of the BAB1.
1. BW: A1 via Nordlippestraße
2. BW: A1 via the Datteln-Hamm Canal
The measure includes ground investigation in the run-up to two new bridge replacement buildings as well as the associated soil mechanical and soil chemical laboratory tests. The services also include the installation of a traffic routing of a shorter duration on the BAB1 or the Nordlippestraße.
The quantities of the main headings are shown below:
Traffic guidance on BAB1: 10 hrs
Traffic routing on Nordlippestraße: 1 hour
Rammkernsondierung: ca. 260 m
Rammsondierungen: ca. 380 m
Rotationstrockenbohrung: ca. 120 m
Rotationsseilkernbohrungen: ca. 20 m