1) The subject of the order includes the construction of 2 biker service sites (MOR) on the route of the Mazurian Bicycle Loop.
2) Different configurations of cubature objects have been adopted in individual MOR, these are:
a) The carport No. 1
The carport is designed for a rest area for cyclists. It is located on a square plan. It is topped by a gable roof supported by two rows, slightly outward tilted timber poles, and two brick walls, full, forming the rear corner of the carat. The roof ridge set diagonally to the base, rises towards the uncovered forewing forming a distinctive pointed apex. Under the canopy, tables with benches will be installed.
b) The carport No. 2 with paramedics
it is a bicycle carport with sanitary facilities adjacent to it. The property is located on a rectangle plan that forms the common basis for both parts. The whole is topped by a timber roof common to both parts, a single-pitched roof, covered with shingles, supported by one end on a row of four posts and the other resting on the walls of a brick building. Wooden poles slightly deflect outward. The two exterior walls constituting a longer side, covered like the roof with timber shingles, are also sloped to the outside and to the center of the building. The gable walls perpendicular to the site, bedridden to the exterior with slate stone.
Part 1 - Construction of Cyclist Service (MOR) No. 4 in Pozezdrze,Construction of a biker service place (MOR) no 4 in the town Pozezdrze
Part 2 - Construction of Cyclist Service (MOR) No. 5 in PozezdrzePart 2 - Construction of Cyclist Service (MOR) No. 5 in Pozezdrze