Ventilation work for the construction of a new school swimming pool and a canteen. The school swimming pool
consists of a basement and a
Ground floor. The canteen consists of only one ground floor.
- Ventilation unit swimming pool 6,000 m3/h
- Ventilation unit changing room/shower 6,800 m3/h
- Supply air unit lifeguard 300 m3/h
- approx. 410 m2 air ducts made of galvanized steel
- approx. 140 m2 air ducts made of Al Mg 3
- approx. 275 m spiral seam pipe made of galvanized steel
- approx. 185 m spiral seam pipe made of Al Mg 3
-14 pcs silencer
- various ventilation flaps and grilles