The construction project is the new construction of the technical town hall in Ismaning.
The building has dimensions of approx. 38 x 22 m and extends over 4 floors.
The scope of the present tender includes the interior doors in UG-2. OG
Main services:
54 pcs Wooden doors with wooden frames, mostly with side glass panels and additional ventilation sash above the door
31 pcs wooden doors with steel frames
8 steel doors with steel frames, mostly as T30/T30RS
LV 118 Interior doors
The scope of the present tender includes the interior doors in UG-2. OG
Main services:
54 pcs Wooden doors with wooden frames, mostly with side glass panels and additional ventilation sash above the door
31 pcs wooden doors with steel frames
8 steel doors with steel frames, mostly as T30/T30RS