Structural extension of the Bettingen waterworks for a softening plant including pre-treatment and the necessary ancillary processes,
approx. 10,000 m³ of enclosed space,
Mechanical and electrical engineering are not covered by this invitation to tender
Structural extension of the Bettingen waterworks,
- Earthworks/excavation approx. 3,500 m³
- Reinforced concrete (floor slab, ceilings, walls) approx. 1,300 m³
- Bewehrungsstahl ca. 170 t
- Installation of wall penetrations up to DN 400
- 4 water tanks in concrete construction (2 pieces with PE lining) incl. pressure doors
- Verblendmauerwerk ca. 450 m²
- Lightweight hall with sandwich panels 20m*26m to 9.5m height
- Underground pipeline construction DN 400, PN 25 approx. 140 m
- Tile work approx. 540 m², approx. 140 m plinth tiles
including the associated ancillary work