Major dismantling and earthworks will be carried out. To facilitate the evacuation of materials and limit the nuisance of trucks, it was agreed to carry out evacuations by river.
For this purpose, a plot of 1,636 m
The implementation of a conveyor belt will link the storage area (called the Eurofood zone) and the port platform, making it possible to evacuate cuttings by barge without generating traffic on public roads.
As part of this project, the company will study, supply and install all the following equipment and installations:
- surveyor,
- execution studies (including FDM, SLI ...),
- site installation,
- supply and installation of metal structures, allowing the installation of the conveyor,
- supply and installation of conveyors and related equipment (hopper, extractor, grasshopper, overband, tunnel conveyor, roof, air gallery conveyor, maintenance bridge, weighing station and speed sensor, dust collection, compressor and barge loading device , rotating chute and loading handle),
- supply and realization of foundations,
- Dossier of executed works (DOE),
- Maintenance of the installation during 12 months.