Dismantling of a temporary bypass, including the associated temporary bridge
(D-bridge), as well as road construction to connect the road to the new bridge for the final state.
Dismantling of a temporary bypass, including the associated temporary bridge (D-bridge), as well as road construction to connect the road to the new bridge for the final state.
Dismantling of the temporary bridge during railway closure breaks.
ca. 35,000 m3 of earthworks
ca. Install 4,500 m3 antifreeze layer
like. 7.500 m2 Asphaltbauarbeiten
ca. Dismantling the 145 t temporary bridge
ca. 2,000 m2 of steel sheet pile wall boxes dismantling including back anchorages
ca. 7,000 m2 asphalt milling