- Reallocation of the infrastructure of the high and low power supplies from 2 exhibition parking lots and 2 access gates including the main guard,
- Cable laying in existing empty pipe systems in the outside area via cable ducts,
- Inventory of existing cable systems outside via cable ducts,
- Conversion work of newly installed high and low current line systems,
- disassembly of outdoor lighting and distribution systems,
- connection work of cables to existing systems,
- Reseal fire barriers.
See information under II.1.4).