Sonneschutzarbeiten_Raffstoreanlagen for the renovation and conversion of a school
As part of the renovation and partial conversion of a school building (B) from the 1970s, manufactured in large panel construction (WBS 70), not basement, 4 full floors, as well as a largely free-standing building with a swimming pool system (therapy bath), manufactured in conventional construction, basement, 1 full floor, the following construction services are awarded in public tender:
- Venetian blind in the area of curtain wall 4 pieces width 2.30m x height 1.7m, 4 pieces width 2.30m x height 2.55m, 10 pieces width 0.9m x height 1250m + box 200mm,
4 pieces width 2.30m x height 2.55m
- Venetian blind single system in the field of ETICS 45 pieces width 2.3m x height 1.7m
- Venetian blind single system in the field of ETICS 4 pieces width 2.01m x height 2.0m
- Venetian blind groups up to 2 hangings in the area of ETICS 28 pieces width 2.3m x height 1.7m
- Venetian blind groups up to 3 hangings in the area of ETICS 6 pieces width 2.3m x height 1.7m
- Superordinate headquarters
-Weather
- Sub-distribution as floor control
- Motorsteuereinheiten je Raffstore
- Connection and commissioning