Construction services, installation services of mechanical and electrical equipment, preparation for commissioning, commissioning and providing evidence of the performance of an extension of the wastewater treatment plant ABA I for the expansion of the infrastructure development at the industrial site Schwarze Pumpe / extension old site IG Spreewitz.
The required construction work, the integration (creation of interfaces), the expansion of reactor 4 and the pellet storage are tendered out and awarded separately.
As part of the expansion of the ABA I, the following measures are required: Adaptation of the supply line for primary treatment in order to alternatively bypass the distribution structure (B220). Equipment of an additional third primary treatment (131 m
The new aeration line is to be equipped additionally with an online measurement of ammonium and nitrate. The sequence of the ABA is to be equipped with an online monitoring for CSB / TOC, NH4, NO3 and P. The existing samplers in the outlet and in the inlet to the ABA I are to be trained.
All newly constructed systems must be connected to each other and / or linked to the stock. Integration points were created under Lot1. For some of the pipelines, accompanying heating and insulation must be installed. The required secondary supports and pipe bridges must be erected on suitable foundations.
Individual small construction works (foundations) are to be provided.
Additional samplers in the inlet and outlet of the system are to be procured and installed. The online measuring technology in the course of the ABA I has to be extended.
The procurement covers the equipment, electrical engineering and automation including software for an operational plant extension.
As a general contractor, the contractor must, among other things, provide the following services: Plant design of the equipment and of the electrical and automation technology, site set-up and provision and securing of the construction site, clearing of the construction site as well as the disposal of the resulting waste. Complete operational installation of plant and electrical engineering, preparation for commissioning including all necessary tests. Carrying out the commissioning and proof of the efficiency of all parts of the described extension. Training of the staff. Support and participation in examinations and acceptances by external examiners. Support in the approval process as necessary.