Pipeline construction from the junction shaft to the planned Unterbalbach elevated tank.
— single line DN 150 GGG ZMU, l = approx. 625 m
— 2 parallel lines DA 110 PE and DA 75 PE, l = approx. 200 m
— 2 parallel cables DN 200 GGG ZMU and DA 75 PE, l = approx. 300 m.
Of which on the section of l = approx. 45 m
Two additional cables DN 200 GGG ZMU and DN 150 GGG ZMU
— new construction of 1 junction bay,
— new construction of 1 water meter bay,
— New construction of 1 interim shaft.