Drywall work for a new building in timber frame construction
Walls:
Single-sided metal stands GK endshells 850 m²
One-sided inner planking timber frame construction exterior walls 1,130 m²
metal stand wall 100 mm 12 m²
Installation wall as metal stand double column system 200 mm 26 m²
Flooding in Q 2 quality: 1,800 m²
wall cutouts 20/20 60 pcs.
wall cutouts 40/20 22 pcs.
Installation bays 40 m²
Cover:
F30 ceiling ground floor 926 m²
Vertical ceiling positions different altitude 70 m
plasterboard ceiling unperforated 80 m²
Ventilation duct cladding 52 m²
Seamless perforated plasterboard ceiling 1,106 m²
Unperforated edges 1,300 m
linear cassette ceilings made of metal 2 pcs.
Hole diameter 25mm to 100mm 290 pcs.
Inspection openings and substructures:
Revision opening 400/400 32 pcs.
Inspection opening 600/600 30 pcs.
veneer plywood sheets for luminaires: 102 pcs.
Cutouts round D = 200mm - 600mm: 232 pcs
Square cutouts 300x300 to 800x800:88 pcs.
Step-shaped room scaffolding with multiple offsets in total: 500 m²