Completion of the B14 — tritium building.
The Tritium Building (B14) is already built up to Level 2 (L2) slab. The scope of this procedure is as follows:
— civil works for B14, from L2 walls up to Roof 1 (R1) slab and Roof 2 (R2) aedicules including reinforced concrete works, embedded items, structural repairs, earthing and lightning, temporary protection of internal openings and temporary waterproofing, rainwater drainage and closure of external openings, weather tightnesson temporary basis.
Estimated volume
Reinforced concrete: 11 800 m
Reinforcements: 3000 tons.