This tender procures an implementing consultant. The overall objective of the consultant’s assignment is to ensure an effective preparation and implementation of the SEMP. The duration of the overall assignment is expected to be approximately 5,5 years. This comprises a preparatory phase of 1 to 1,5 years and an implementation phase of approximately 4 years. The project requires multiple consultancy services that shall be provided by 1 consultant and thus will be procured in a single package with options:
— feasibility study (basic contract),
— interim consultancy services (option 1),
— implementation mandate, stage I (option 2),
— implementation mandate, stage II (option 3).
The Terms of Reference, included in the attached tender documents, provide the details on the scope and requested services for the basic contract and all options.
This tender procures an implementing consultant. The overall objective of the consultant’s assignment is to ensure an effective preparation and implementation of the SEMP. The duration of the overall assignment is expected to be approximately 5,5 years. This comprises a preparatory phase of 1 to 1,5 years and an implementation phase of approximately 4 years. The project requires multiple consultancy services that shall be provided by 1 consultant and thus will be procured in a single package with options:
— feasibility study (basic contract),
— interim consultancy services (option 1),
— implementation mandate, stage I (option 2),
— implementation mandate, stage II (option 3).
The Terms of Reference, included in the attached tender documents, provide the details on the scope and requested services for the basic contract and all options.