At southern Oberwiesenfeld, near the Olympic Park, along the Schweere Reiter Straße, stadibau is planning a new residential district with a total of around 670 apartments for state staff, 3 daycare centers and offices.
The construction project is divided into 2 construction stages:
- BA1: house 1 and house 2, with approx. 342 apartments, 2 daycare centers and offices
- BA2: house 3 and house 4, with about 350 apartments, 1 daycare center
In the present proceedings, metal construction work is put out to tender for BA2.
For more information, see point II.2.4
Locksmith work outdoors, fall protection, balconies, loggias, external stairs, grating covers for light wells, consisting of:
Stair railing for external stairs Kita EG - 1st floor as railing with cheek panel as steel flat, each made of galvanized steel and wet painted, approx. 13 m
Handrail made of stainless steel to the aforementioned railings and wall-side, in 2 heights, total approx. 54 m,
Grating covers for light wells, dimensions min. 70x110 cm, max. 70x330 cm,
approx. 28 pieces
Fall protection balconies, loggias, escape balconies each made of flat steel with frame and vertical filling rods, hot-dip galvanized and powder-coated,
a total of approx. 374 pieces, corresponds to approx. 1,100 m