The orthopaedic building complex built at the beginning of the 30s in Semmelweis-/Philipp-Rosenthal-Straße, which has already been renovated and unused several times, for the last time as a psychiatry, is again in need of renovation. A core task is the complete replacement of the ailing drinking water system, including connection to the public utilities, as well as the upgrading of the low-voltage grid, especially in the telecommunications sector. In addition, there are mandatory interventions in the main building distribution to ensure operation.
Sanitary:
4500 m dismantling water pipe
3000 m dismantling sewage pipe
Dismantle and dispose of 408 pcs sanitary objects incl. all accessories
4000 m sewage pipe and fittings (PP Silent, SML) New construction and interim solutions
10500 m stainless steel pipe incl. insulation and valves
1 pcs pressure boosting system
1 pcs automatic network for circulation and flushing valves (112 circulation controllers incl. valves, temp. sensors and flow meters / 36 flushing valves incl.
Necessary accessories / 5 master boxes / 8 power boxes / internal cabling)
419 pcs sanitary objects incl. accessories (washbasins, toilets, showers) and pre-wall elements
66 pcs shower partitions
Heater:
Dismantle + store 175 existing heating surfaces, reinstall
Dismantle and dispose of 29 heating surfaces
Dismantle 250 m heating cables (connections to old heating surfaces)
1 pc hot water production (based on UKL standard) 208. kW power
approx. 900 m steel pipe welded and pressed up to DN 65 for the connection of the new water heating system, as well as the connection to the new ventilation technology Incl.
Insulation and valve technology
240 m composite pipe Enclosures and extensions/adaptations in the renovation areas of the baths Incl. insulation and valve technology
10 pcs tubular radiators galvanized for bathrooms new
Ancillary services such as drilling, structural steel for route expansion