Ventilation and air-conditioning installation work | Tenderlake

Ventilation and air-conditioning installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 March 2019
Closing Date:
11 April 2019
Location(s):
DE25C Weißenburg-Gunzenhausen (DE Germany/DEUTSCHLAND)
Description:

Mechanical ventilation systems with heat recovery are used.

These supply the areas -Halle, showers / changing rooms / - WC

The maximum air volume for the hall will be 20 m per person 3 / h provided.

The same value is also applied for the condition rooms.

The toilet facilities are ventilated according to the number of furnishings.

Galvanized ducts and pipes are used as ventilation ducts.

The protection against fire and smoke transmission is ensured by motorized fire dampers.



- Supply and exhaust air unit 20 000 m 3 / h 1 piece,

- Supply and exhaust air unit 7 000 m 3 / h 1 piece,

- Exhaust fan 550 m 3 / h 1 piece,

- Fire dampers approx. 33 pieces,

- volumetric flow controller 9 pieces,

- Ventilation duct with accessories approx. 2 000 m 2 .

- spiral folded / flexible tube NW 100 - NW 800 approx. 475 m,

- Air outlets, jet nozzles, grilles and TV's about 165 pieces,

- Silencer approx. 62 pieces,

- overflows 6 pieces,

- MSR control and switchgear 1 piece.

Download full details as .pdf
The Buyer:
Stadt Weißenburg in Bayern
CPV Code(s):
45331200 - Ventilation and air-conditioning installation work
45331221 - Partial air-conditioning installation work