Delivery and installation of the heating and refrigeration systems in the construction project New Laboratory Building Beuth-Hochschule in Berlin.
Heater:
— heat supply via district heating network with indirect connection via plate heat exchangers and heating circuit distributor, heat output 1044 kW,
— heat supply of 5 HVT system registers with a total output of 900 kW,
— Static heating surfaces as panel radiators with a heat output of 144 kW for 275 radiators, hygienic in laboratories,
— steel pipelines 4 900 m in dimensions DN15 to DN100, with insulation work.
Cold:
— cooling supply via two air-cooled refrigerators with free cooling on the roof, indirect connection of more than 2 000 l buffer cylinder and refrigerant circuit distributor, cooling capacity 420 kW,
— the cooling supply of 2 air handling system registers with a total output of 125 kW,
— Connection of 50 circulating cooling units, whereby 16 units are autonomous controlled by cable remote control and 34 units are integrated into the MSR individual room control unit.
— connection of cooling water in laboratories 95 pcs.
— steel pipeline 2 200 m in dimensions DN15 to DN150, with insulation work,
— Stainless steel pipeline (network laboratory cooling water) 2 200 m in dimensions DN15 to DN100, with insulation work.