Lot B 16: Carpentry
Fire and smoke protection doors (wooden) 11.0 pcs
Soundproof doors (wood) 59.0 pcs
Moisture-proof doors (wood) 28.0 pcs
Other wooden doors 3.0 pcs
Skylights, F30 / G 30, fixed glazed 3.0 pcs
Wooden window sills, inside, w = 20-30 cm 220.0 m
Sanitary partitions with doors, h = 2.0 m, l = 41.4 m
Start of construction: 29.01.2024
Installation of window sills (inside) until 22 week 2024
Installation of door frames by week 26, 2024