the consultation concerns renovation work on an extracurricular building located rue du port in Chécy (45). The work program is established in 4 lots: exterior carpentry, flooring and painting, plumbing heating and electricity. A site visit is mandatory and scheduled in the RC.Presentation of the operationthe program of renovation work is as follows:-Replacement of the wooden exterior joinery-replacement of radiators-upgrading to electrical standards and replacement of the luminaires by LED pavers-Ground floor: Repair of the paintings and the floor-1st floor: Repair of the wall coverings and the plastic floor, development of sanitary facilities in place of the current bathroom and toilets
Exterior wood furnishingsthe works of this lot will include all the supplies and implementation of all the following works:- the removal of existing wooden joinery- the supply and installation of Pvc joinery in renovation system- in PSE: the replacement of the crutches of all the interior doors
Flooring and paintsthe works of this lot will include all the supplies and implementation of all the works:Floor covering work:- removal of existing coverings (carpets / flexible floors)- Installation of glued flexible floor coverings- Wall coverings- Accessory work- Cleaningwork of wall coverings painting and earthenware:- Removal of carpets and wallpapers at R + 1- Removal of wall earthenware- Interior paintings on woodwork- Interior paintings on metal works, pipes- paintings on walls and ceilings- wall coverings on walls (earthenware to the right of sanitary appliances)- cleaning
PlumbingDemolition of partitioning and bath apron of any kind and thickness, including all cutting and felling constraints. Isolation and neutralization of networks. Removal of all unpreserved supply pipes, Ec and Ef, drain, all fixing accessories, (collars, strikers) ducts in passage of walls or floors, including capping at the location of the crossings and plaster connections (of the same nature as the support - plaster or cement) for the water point created in the cloakroom R + 1: Connection from the existing kitchen (Control room), For the modification of sanitary facilities to R + 1: Connection from existing networks in the sanitary with installation of shut-off valves. Sanitary equipment: suspended toilet bowl, vanity unit, sink unit, replacement of the entire network and building radiators
Electricitythe work includes:- the relocation of existing sockets (1.20m height children)- the addition of additional sockets and the modification of the associated electrical cabinets- the verification of existing technical equipment according to report R221185.01.60.22.Q.015Rased Jb- the verification and adjustment of the ground resistance of the equipment- the replacement of existing luminaires by LED type luminaires