Since 2016, the Musik- und Kongresshalle (MuK) has been renovated in several construction phases. As part of the construction phase 2.9 kitchen cubes, the commercial kitchen of MuK, including the associated rooms, is gutted and rebuilt. The scope of services includes coating work on the floor and wall surfaces.
Floor coating:
— 166 m wall connection, V2A profile for fillet
— 75 wall connection V2A corner section,
— 166 m primer stainless steel profile, 168 m
— 168 m
— 186 pieces of epoxy grout,
- 168 m
Wall coating:
— 325 m
— 186 m wall endcap, V2A profile,
— 425 m
— 186 m of face spatulas of transitions,
— 425 m
— 425 m
— 425 m
— 425 m
— 186 m connection joints floor wall.