Thermal insulation composite system for the new construction of the company and machine building.
For the operating and machine buildings (5 buildings), the following work must be carried out for the composite thermal insulation system:
- approx. 995 m
- approx. 120 m fire insulation with 160 mm rock wool panels;
- approx. 1 350 m
- approx. 2 300 m