Drywall construction work on the 4th construction phase during the general renovation of a grammar school
Drywall work for the general renovation of a high school.
Gross volume (BRI) BA IV:
(after refurbishment)
BT C: 5.881,50m³
Trockenbauarbeiten:
In the course of the renovation, the existing building will be largely restored to its shell state. In addition to the existing walls, new walls or pre-walls in drywall construction are sometimes added, and ceilings are suspended.
Main positions:
- approx. 650 m² partition walls
- approx. 50 m² free-standing facing shell
- approx. 98 m² Directly attached facing shell with hat profile
- approx. 300 m² Unterdecke F0
- approx. 50 m² Unterdecke F90
- approx. 25 m² ceiling covering, smooth
- approx. 800 m² Akustikdecke
- approx. 350 m² wood wool lightweight panel ceiling