New construction / adaptation / restoration of the outdoor area of the Meiningen steam locomotive adventure world
Excavated soil for traffic areas, Z1.1 349.18 m3
Embedding and pouring over cable trenches 6.5 m3
Multi-stone system, large paving for terrace 117.30 m2
Asphaltdeckschicht abstract, AC 8 D N 148 m2
Concrete composite pavement, 170x164x80 348.30 m2
Concrete turf slabs 163 m2
Mesh fence, height 1.40m 56.70 m
Production of natural stone wall (2-sided exposed masonry) 11.20 m3
Angle supports 405x50cm 6 pcs
Block steps 16/31 5 pcs
Rainwater system (pipes & accessories) 1 psch
Bicycle backrest bracket 8 pcs
Supplying and planting mixed perennial planting 185 m2
Development care high trunks (2 years) 10 pcs
Construction site equipment 1 psch
Demolition obstacles in the ground 6 m3