the purpose of this consultation is to carry out work to divert a concrete Dn1400 pipe between the municipalities of Montferrier-Sur-Lez and Montpellier. This is preparatory work carried out as part of the creation of line 5 of the tramway. There are no plans to break it down into lots or slices
the purpose of this consultation is to carry out work to divert a concrete Dn1400 pipe between the municipalities of Montferrier-Sur-Lez and Montpellier. This is preparatory work carried out as part of the creation of line 5 of the tramway