On the school grounds of Pater-Wilhelm-Fink-Strasse 18, an extension is to be built with a connecting passage to the existing building: Painting and painting work - ETICS, DIN 18363, 18345 Execution period: KW 38/2020 - KW 13/2021:
The primary and middle school of Rottenburg ad Laaber is located at Pater-Wilhelm-Fink Straße 18. An extension to the school is to be built on the associated school playground. A connecting corridor should also be created between the existing and the new building. The following approximate information is relevant for the measure:
- 890 m