Estimated volume of the agreement:
Contract D44 covers the finalization of the detailed design, supply and installation of traction and electrical equipment within the new to build rectifier plants TSS13, TSS14, TSS15, TSS16
There shall be an interconnection to the existing line BT1 at Bystasjonen (TSS01) and Kronstad
Disassembling and rebuilding of 1 already existing traction group at Kronstad, to be stored for approx 2 years and be re-built, and installed in Løvstakken Depot in Fyllingsdalen.
This contract will supply and install all building equipment for the rectifier plant in Løvstakken.
Option 1: One Additional rectifier;
Option 2: Spare parts;
Option 3: Additional line switch.
For further information on the scope and content of the procurement, refer to the Appendix A and E1.
Estimated volume of the agreement:
Contract D44 covers the finalization of the detailed design, supply and installation of traction and electrical equipment within the new to build rectifier plants TSS13, TSS14, TSS15, TSS16
There shall be an interconnection to the existing line BT1 at Bystasjonen (TSS01) and Kronstad
Disassembling and rebuilding of 1 already existing traction group at Kronstad, to be stored for approx 2 years and be re-built and installed in Løvstakken Depot in Fyllingsdalen.
This contract will supply and install all building equipment for the rectifier plant in Løvstakken.
Option 1: One additional rectifier;
Option 2: Spare parts;
Option 3: Additional line switch.
For further information on the scope and content of the procurement, refer to the Appendix A and E1.