Heating, ventilation and air-conditioning installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
02 June 2020
Closing Date:
16 July 2020
Location(s):
DE300 Berlin (DE Germany/DEUTSCHLAND)
Description:
Ventilation including maintenance - KKE 4.751

Exhibition and presentation of archaeological finds to the public; archaeological workshops for processing, securing and archiving archaeological finds, which are also open to the public as a show workshop; Conducting seminars and events.

Ventilation installation according to the applicable standards and regulations

Construction of 5 ventilation and 2 full air conditioning systems for a new building. As part of the construction work ("KKE 4.751 - Ventilation systems"), the following essential services are to be performed:

Air conditioning system 01 0 Sanitary and ancillary rooms

- supply air and exhaust air system;

- Supply air 3 430 m 3rd /H;

- Exhaust air 3 430 m 3rd /H;

- heat recovery rotary heat exchanger;

- Air treatment stages heating;

- Air pipe system up to DN 315;

- Design galvanized steel;

- Length about 958 m.

HVAC system 02 laboratory

- supply air and exhaust air system;

- Supply air 2 790 m 3rd /H;

- Exhaust air 3 860 m 3rd /H;

- heat recovery (cross-flow heat exchanger);

- Air treatment stages heating, cooling, humidifying and dehumidifying;

- Air duct system up to DN 224 / edge length up to 1,000 mm;

- galvanized steel;

- Length about 464 m.

HVAC system 03 exhibition

- supply air and exhaust air system;

- Supply air 6 200 m 3rd /H;

- Exhaust air 6 200 m 3rd /H;

- heat recovery (rotary heat exchanger);

- Air treatment stages heating, cooling, humidifying and dehumidifying;

- Air duct system up to DN 224 / edge length up to 1,000 mm;

- galvanized steel;

- Length approx. 696 m.

Ventilation system 04 Exhaust air SiBel

- exhaust system;

- exhaust air 50 m 3rd /H;

- Air duct system up to DN 100;

- galvanized steel;

- Length about 22 m.

HVAC system 05 digestories

- exhaust system;

- Exhaust air 1,260 m 3rd /H;

- Air pipe system up to DN 355;

- execution of PPs;

- Length about 82 m.

HVAC system 06 Hazardous substances cabinets

- exhaust system;

- Exhaust air 100 m 3rd /H;

- Air pipe system up to DN 160;

- execution of PPs;

- Length about 87 m.

HVAC system 07 Exhaust air excavation area

- exhaust system;

- Exhaust air 1,320 m 3rd /H;

- Air pipe system up to DN 400;

- galvanized steel;

- Length about 26 m.

Download full details as .pdf
The Buyer:
Senatsverwaltung für Stadtentwicklung und Wohnen (V M 1-16)
CPV Code(s):
45331000 - Heating, ventilation and air-conditioning installation work