Connection of existing bathing water technology and HVAC control to BMS, new ASP/ISP, installation of central BMS incl. computer
Short description of the preliminary information LV – 8505 Measurement and control technology LOS 1 BT A-E
Type and scope of the object of the order:
The construction project involves the renovation, modernization and expansion of the wish spa in Winnenden.
Here especially the LOT 1 for the entire property component A-E main building, course pool and summer changing room
On 19.08.2022, a prior information notice was posted via TED throughout Europe, which serves to shorten the deadline for the receipt of the offers.
Main building Renovation and extension: Two-storey and partial basement
New course pool: single-storey with basement
New summer changing room: single storey and partial basement
Automationsschwerpunkte/ Informationsschwerpunkte
• Connection of existing bathing water technology and HVAC control to new BMS
• 1 ASP/ISP in der Sommerumkleide für HZG, SAN, RLT
• 1 ASP/ISP in new HVAC control panel OG for connection of on-site HVAC control cabinets to new BMS and control of ventilation components
• Approx. 5 ASP/ISP in new technical centre Course basin for HZG, RLT, SAN, new bathing water technology system
• Setup of central BMS incl. BMS computer
Built-in parts:
• Control cabinet installations for approx. 1,200 data points distributed to all ASPs
• Delivery of approx. 45 2- and 3-way control valves incl. actuator for heating and cooling
• Various valve terminals for controlling pneumatic valves (SAN & bath water technology)
Performance dates:
Execution period: December 2022 to May 2024
Completion of new opening of the entire complex 01.06.2024
Appointments:
SOMMERUMKLEIDE
Completion May 2023