The turnkey implementation of a 4-tier secondary school is planned, including a school sports hall as a two-field hall.
The construction project also includes the associated outdoor facilities as well as the furnishing / equipment of the school and sports hall.
Content lot 34:
- 11 darkening systems with 100% darkening and side guide rails as well as lower end profile, electrically driven, single size up to 8.0 m
- 20 pieces of glare protection directly in front of the glazing in the window profiles, folding blinds semi-transparent with manual operation, single size up to 2.0 m
- 12 pieces of sun protection - roller blind incl. Aluminum boxes, curtain reflection-coated B1 material, manual operation, single size up to 5.5 m