New construction of a pump house (without TGA)
Main services:
Remove approx. 110 m3 topsoil,
ca. 750 m3 Baugrubenaushub,
ca. 600 m3 Bodeneinbau (Bauwerkshinterfüllung),
approx. 520 m2 of sheet piling / pulling
install approx. 100 m3 reinforced concrete,
install approx. 14 t of structural steel,
approx. 33 m install pipelines DN 300 - DN 600 (concrete/plastic), individual lengths up to 10 m.
approx. 6 m embankment staircase,
produce approx. 14 m precast angle retaining wall,
Mount 5 pcs. mounting/entry openings (stainless steel),
1 pcs Plate slide DN 500 mount,
Supply and installation of 1 switch house
Mounting lightning protection (foundation / wrestling earther)