Supply and installation of digital boards for the following schools of the district of Fürstenfeldbruck:
— Max-Born-Gymnasium, Johann-Sebastian-Bach-Straße 8, 82110 Germering, 17 pieces
— Realschule Puchheim, Mayor Ertl Straße 9, 82178 Puchheim 25 pieces
— Gymnasium Puchheim, Mayor Ertl Straße 11, 82178 Puchheim 11 pieces
— Gymnasium Gröbenzell, Wildmoosstraße 34, 82194 Gröbenzell, 34 pieces
— Carl-Spitzweg-Gymnasium Germering, Masurenweg 2, 82110 Germering 31 Pieces
— FOS Germering, Masurenweg 2, 82110 Germering 6 pieces
— Realschule Unterpfaffenhofen, Masurenweg 4, 82110 Germering
— Pestalozzi School, Theodor-Heuss-Straße 1, 82256 Fürstenfeldbruck, 19 pieces
— FOS/BOS FFB, Münchner Strasse 67, 82256 Fuerstenfeldbruck 48 pieces
— Orlando-di-Lasso-Realschule Maisach, Lusstraße 36, 82216 Maisach 2 pieces,
— Gymnasium Olching, Georgenstraße 2, 82140 Olching 28 pieces.
Delivery of digital boards with interactive projector to the Max-Born Gymnasium GermeringDelivery, assembly and installation of
— 17 digital boards with interactive projector.
Dismantling of old panels
— 14 pieces
Disposal of old panels
— up to 14 pieces.
Delivery of digital boards with interactive projector to the Orlando di Lasso-Realschule MaisachDelivery, assembly and installation of
— 2 digital panels with interactive projector.
Dismantling of old board
— Plain blackboard 1 piece (digital)
Disposal of old board
— Up to 1 panel wall panel (digital).
Delivery of digital boards with and without interactive projector for the Gymnasium OlchingDelivery, assembly and installation of
— 26 digital panels with interactive projector
— 2 digital panels without interactive projector.
Dismantling of old panels
— Double sliding panels up to 3.5 m wide 10 pieces
Disposal of old panels
— up to 16 freestanding panels,
— Up to 10 double slide-panel panels up to 3.5 m wide.
Delivery of digital boards with interactive projector to Realschule PuchheimDelivery, assembly and installation of
— 25 digital boards with interactive projector
dismantling of old
— pylon hinged sliding panels 13 pieces,
— hinged sliding panels without pylons 2 pieces,
— double surface sliding panels up to 3 m wide 4 pieces
— double sliding panels 4 m 3 pieces,
Disposal of old panels
— up to 3 freestanding panels,
— up to 13 pylon hinged sliding panels,
— up to 2 folding sliding panels without pylons,
— up to 4 double sliding panels up to 3 m wide,
— up to 3 double sliding panels 4 m.
Delivery of digital boards with interactive projector to Gymnasium PuchheimDelivery, assembly and installation of
— 11 digital boards with interactive projector.
Dismantling of old panels
— Double panel sliding panels up to 4 m wide 3 pieces
Disposal of old panels
— up to 8 freestanding panels,
— up to 3 double sliding panels up to 4 m wide.
Delivery of digital boards without interactive projector to Gröbenzell GymnasiumDelivery, assembly and installation of
— 34 digital boards without interactive projector.
Dismantling of old panels
— pylon hinged sliding panels, 11 pieces,
— Sliding slipboards 17 pieces,
— double sliding panels up to 3 m wide 1 piece
— Sliding panel 3 m width 4 pieces
Disposal of old panels
— up to 11 pylon hinged sliding panels,
— up to 17 folding sliding panels,
— up to 1 double sliding panel up to 3 m wide,
— Up to 4 sliding panel 3 m wide.
Delivery of digital boards with interactive projector to the Carl Spitzweg GymnasiumDelivery, assembly and installation of
— 31 digital panels with interactive projector.
Dismantling of old panels
— pylon hinged sliding panels, 18 pieces,
— Sliding hinged panels, 2 pieces,
— Sliding panel 3 m wide 1 piece
— double sliding panels up to 4 m wide, 10 pieces
Decogregation of old panels
— up to 18 pylon hinged sliding panels,
— up to 2 folding sliding panels,
— up to 1 slide-panel 3 m wide
— Up to 10 double sliding panels up to 4 m wide.
Delivery of digital boards with interactive projector for the technical secondary school GermeringDelivery, assembly and installation of
— 6 digital boards with interactive projector.
Disposal of old panels:
— up to 6 freestanding panels.
Delivery of digital boards with interactive projector to the secondary school UnterpfaffenhofenDelivery, assembly and installation of
— 10 digital boards with interactive projector.
Dismantling of old panels
— pylon folding sliding panel 1 piece,
— Single-surface pylon sliding panels, 7 pieces,
Disposal of old panels
— up to 9 freestanding panels,
— up to 1 pylon flushboard,
- Up to 7 single-surface pylon sliding panels.
Delivery of digital boards with interactive projector to the Pestalozzi SchoolDelivery, assembly and installation of
— 19 digital panels with interactive projector.
dismantling of old
— mechanical canvases 2 pieces,
— double panel sliding panels up to 2.5 m wide 4 pieces,
— pylon hinged sliding panels 10 pieces,
— hinged sliding panels without pylons 3 pieces,
Disposal of
— up to 2 mechanical screens,
— up to 4 double sliding panels up to 2.5 m wide,
— up to 10 pylon hinged sliding panels,
— Up to 3 folding sliding panels without pylons.
Delivery of digital boards with interactive projector to the Fürstenfeldbruck technical college and vocational secondary schoolDelivery, assembly and installation of
— 48 digital panels with interactive projector.
Dismantling of old panels
— hinged sliding panels without pylons, 39 pieces,
— double surface sliding panels up to 3 m wide 3 pieces,
— pylon hinged sliding panels, 2 pieces,
Disposal of old panels
— up to 39 folding sliding panels without pylons,
— up to 3 double sliding panels up to 3 m wide,
- Up to 2 pylon hinged sliding panels