Renewal and extension of the existing heating piping, fresh water stations, buffer storage tanks, heat distributors, pressure control, degassing
The construction project involves the renovation, modernization and expansion of the wish spa in Winnenden.
Here especially the LOS 2 heating system for the component A-D main building and course pool.
A prior information notice on TED was given on 19.08.2022, which serves to shorten the deadline for the receipt of the offers.
Main building Renovation and extension: Two-storey and partial basement
New course pool: single-storey with basement
Heating system and hot water preparation
• Renewal of piping district heating connection
• Renewal of piping heating side fresh water stations incl. buffer tank
• 2 heating distributors and accessories (approx. 19 outlets of different dimensions)
• Pressure maintenance and degassing for approx. 30,000 l system volume
Built-in parts:
• In total approx. 400 valves (strangabsperr- , strangregulierventile, shut-off valves)
• Fittings for motorized control valves (2 & 3 ways), as well as installation of MSR provided valves
• Approx. 28 circulation pumps
• Approx. 4,400 m of pipelines black steel pipe DN 15 – DN 150 with thermal insulation and moulded parts
• Approx. 100 pcs tube radiators and flat radiators, partly hot-dip galvanized
• Approx. 6 pcs circulating air blower convectors with 4-wire connection as wall unit
Performance dates:
Execution period: December 2022 to May 2024
Completion of new opening 01.06.2024