Conclusion of natural gas supply contracts including network use in the period from 01.01.2024 to 01.01.2026.
Lot 1 Location HeideDelivery of approx. 15.5/a GWh of natural gas including grid use in the period 01.01.2024 to 01.01.2026.
Lot 2 Location BrunsbüttelDelivery of approx. 3.7 GWh/a of natural gas including grid use in the period from 01.01.2024 to 01.01.2026.