Demolition and dismantling work.
Dismantling and disposal work of non-load-bearing components and fixtures in a two-storey existing building (year of construction 1960) including interior fittings, installation and fixtures.
Dismantling and disposal (total demolition) of a retrofitted teacher's room (year of construction 1998).
Dismantling and disposal (total demolition) of the roof structure including roof covering and gable walls except for the OK ceiling above the 1st floor
Key data:
- BRI building 9 660.16 m
- BRI roof truss 2 144.95 m
A total of:
- Demolition concrete 100.20 m
- Demolition of wooden materials 1 402.00 m
- Demolition of steel profiles 25.00 m;
- demolition of wooden beams 3,000 m;
- Demolition of insulation materials 111.00 m
- Demolition roof covering 1 730.00 m
- demolition window 273 pieces;
- Demolition window sills 89 pieces;
- Demolition waterproofing 188.00 m
- Demolition interior doors 97 pieces;
- Demolition tiles (wall, floor) 441.00 m
- Demolition of suspended ceilings 294.00 m
- Demolition of the UK drop ceiling 294.00 m
- Demolition radiator, 170 pieces;
- Demolition sink, toilet 40 pieces;
- Demolition inventory (fitted wardrobes) 11 pieces;
- Demolition masonry 179.00 m
- Demolition wall covering (wallpaper, plaster 0.4 cm) 949.00 m
- Demolition of flooring (PVC, needle fleece) 1,519.00 m