Manufacture of outdoor facilities in the course of the replacement new primary school with nursery and sports hall in 09579 Grünhainichen.
— absorb 1 246 m³ layer without binder, dispose of, d up to 40 cm,
— break off, eliminate 300 m
— 1 130 m³ loosen soil, interim storage,
— reinstall 500 m³ on-site excavation dissolved on site; dispose of soil
— 250 m³ of terrain and embankment regulation,
— 455 m³ soil improvement — lower layer
— 455 m³ soil improvement — upper layer
— put 7 mast sleeve DN 300 PE-HD in concrete, T 1.5 m,
— excavate 243 m³ of pipeline trench,
— 476 m
— produce 3 273 m
— lay 1 446 m
— 6 pcs. control shaft DN 400,
— 182 m rainwater sewer pipe DN 150 PP,
— 106 m drainage channel, NW 100, B125,
— 106 m gutter cover, grey plastic web grate, B125,
— 16 m drainage channel, NW 200, D 400,
— 16 m cover drainage channel, mesh grate, D 400,
— 73 m drainage flat channel, NW 200, B 125,
— drainage channel cover, NW 200, mesh grate, B 125,
— 1 pc entrance grating 1.86 x 1.40 m,
— 1 pc entrance grating 3.50 x 2.30 m,
— 1 pc entrance grating 3.50 x 2.20 m,
— 292 m
—
— 292 m
— 420 m³ antifreeze layer — 0/56 mm, 100 MPa,
— 245 m³ antifreeze layer — 0/45 mm, 80 MPa,
— 180 m³ antifreeze layer - 0/32 mm, 80 MPa,
— 254 m³ gravel base layer — 0/45 mm, 120 MPa,
— 638 m curb concrete TB 10 x 25, without chamfer,
— 340 m
— produce 340 m
— supply and install 1 125 m
— 374 m
— 508 m
— 508 m
— 562 m
— 562 m
— supply and install
— 562 m
— 360 m ruled for runways and runways,
— supply and bring in 165 m³ fall protection gravel 2/8 mm
— 26 m block step concrete, with contrast insert
— 56 m block step concrete,
— 7 pcs angle support element L 130, W 100 cm,
— 3 pcs shut-off bollard,
— 6 pcs bicycle reclamps,
— 60 m steel mesh fence h 1 430 mm,
— 1 pc double leaf swing gate, h 1 430 mm, clear width 5 800 mm,
— 32 m fall protection,
— 1 pc swing gate single-leaf, h 1,120 mm, clear width 2 100 mm,
— 19 m double handrail stainless steel,
— 1 pc garbage site, open partially clad without practice roofing,
— 1 pc bench with backrest,
— 1 pc wooden bridge/jetty,
— loosen 3 403 m
— 330 m³ vegetation layer — d 10 cm — deliver and apply
— produce 3 403 m
— excavate 20 pcs. plant pit for high stem,
— excavate and fill 28 pcs solitaire shrub planting pit,
— 20 St. Hochstamm, various varieties, supply and plant,
— 28 pcs shrub, various varieties, supply and plant,
— 3 297 m