Rent of four stationary red light monitoring systems.
As part of the monitoring of the flowing traffic for stationary red light monitoring in the area of the client, the contractor assumes all technical and logistical assistance as described below:
The contractor installs the aforementioned traffic monitoring system for the designated lanes at the locations mentioned for his own account. This also includes the necessary planning, construction, assembly and commissioning work. The measuring devices are to be made available in a sabotage-proof version.
There are four stationary measuring points.
1. Reichenbacher Straße / Knielohstraße driving direction and Röntgenstraße from 1.11.2020,
2. B92Trockentalstraße / Straßberger Straße direction Dittrichplatz from 1.12.2020,
3. B92 Böhlerstraße / Wiesenstraße direction of travel out of town from 1.1.2021,
4. Chamissostraße / Reißiger Straße Driving direction into the city from 1.1.2021.